 |
 |
|

The dark plaster is still drying.
|
|  |
|

After the hardshell plaster was dry, buildings were test fitted.
|
|
   |
 |
|

Rocks have ben molded on to the hardshell and colored (brown areas). Green ground foam used as basic ground cover.
|
|  |
|

Trees, shrubbery and ground cover in place. Still needs final detailing.
|
|
|